CIP Completed Projects

Prince Memorial Skatepark Improvement

Facility Improvements included a new restroom facility and drinking fountain.

Project Manager: Kymberly Corbin, (760) 435-3534 or KCorbin@oceansideca.org

Project #: CIP21-00017

Program: Parks

Completion: Summer 2022 


Pickleball Courts Phase 1

Additional courts at Melba Bishop Park.

Project Manager: Kymberly Corbin, (760) 435-3534 or kcorbin@oceansideca.org

Project #: CIP21-00009

Program: Parks

Completion: Summer 2022


Mance Buchanan Field Lights

Sports Field lighting was added to the other half of Mance Buchanan park.

Project Manager: Kymberly Corbin, (760) 435-3534, kcorbin@oceansideca.org

Project #: CIP21-00013

Program: Parks

Completion:
Summer 2022


Fire Training Tower

Project improved the fire training facility located on Jones Road with a burn structure, pump house, and deflection wall  constructed within the existing site limits.  This project was funded in part by Measure X.

Project Manager: Kymberly Corbin, (760) 435-3534 or kcorbin@oceansideca.org

Program: Municipal Buildings

Completion: Summer 2022


El Corazon Aquatic Center

Please visit the El Corazon Aquatic Center page for more details and updates.

Development of a new aquatics center adjacent to the El Corazon Senior Center.  The project included administration, locker-room and equipment facility buildings, a new shared multi-purpose hall,  a 56-meter competition pool, educational pool, splash pad and outdoor event areas.

Project Manager: Brian Thomas, (760) 435-5074 or BThomas@oceansideca.org

Project #: CIP15-00020

Program: Municipal Buildings

Completion: August 2021


Railroad Crossing Safety Improvements

Please visit the Quiet Zone Update page for more details and updates.

Construction of safety-related improvements at the five at-grade railroad crossings in the coastal rail trail corridor. The specific crossings are Surfrider Avenue, Mission Avenue, Wisconsin Street, Oceanside Blvd, and Cassidy Street.

Project Manager: David Toschak, (760) 435-5106 or DToschak@oceansideca.org

Project #: CIP14-00013

Program: Transnet

Completion:


Traffic Signal @ RDO/San Ramon

New Traffic Signal improvement located at RDO & San Ramon.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@oceansideca.org

Project #: CIP19-00006

Program: Thoroughfare-Signals

Completion: March 2021


Mission Ave Design & Reconstruction (East of Myers)

Project Manager: David Toschak, (760) 435-5106 or DToschak@oceansideca.org

Project #: CIP20-00009

Program: Transnet

Completion:


Tyson Street Restrooms

This project includes the demolition and reconstruction of the Tyson Street Park restroom building.

Project Manager: Mahsima Mohammadi, (760) 435-3548 or MMohammadi@oceansideca.org

Project#: CIP17-00003

Program: Parks

Duration: 03/14/2017 - 01/09/2020


Annual Slurry Seal FY19-20

Road Repairs: potholes/slurry seals.

Project Manager: Darra Woods, (760) 435-5094 or DWoods@oceansideca.org

Project #: CIP19-00014

Program: SB-1

Duration: Began October 2019, with completion of March 2021

FY19-20 - Slurry Seal Project Location Map

   

Annual Overlay FY19-20

This project provides asphalt overlay of City streets. This project is funded in part by Measure X.

Project Manager: Darra Woods, (760) 435-5094 or DWoods@oceansideca.org

Project #: CIP19-00013

Program: SB-1

Duration: Began October 2019, with completion of November 2021


Annual Slurry Seal FY20-21

Road Repairs: potholes/slurry seals.

Project Manager: Darra Woods, (760) 435-5094 or DWoods@oceansideca.org

Project #: CIP21-00002

Program: SB-1, Trans Net, Measure X

Duration: Began September 2021, with completion of November 2021


Annual Overlay FY20-21

The project provides asphalt overlay of City streets. Street selections are made based on computerized pavement management system information, staff's review to determine the high priorities for restoration, and citizen's reports of deteriorating street conditions. This project is funded in part by Measure X.

Full Depth Reclamation (FDR) Process:
https://www.youtube.com/watch?v=c-oMzqB0MS0
https://www.youtube.com/watch?v=mWtDOB5n7tI

Project Manager: Darra Woods, (760) 435-5094 or DWoods@oceansideca.org

Project #: CIP21-00003

Program: SB-1, Trans Net, Measure X

Duration: Began September 2021, with completion of November 2021.


Mission Ave Median Improvements

This project includes the construction of median frontage improvements on the south side of Mission Avenue.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@oceansideca.org

Project#: CIP16-00009

Program: Transnet

Duration: 08/19/2016 - 06/04/2020


Balderrama Park Improvements

This project includes the construction of new park improvements.

Project Manager: David Toschak, (760) 435-5106 or DToschak@oceansideca.org

Project#: CIP18-00005

Program: Parks

Duration: 05/08/2018 - 12/03/2020


Fire Station 4 Phase 1 Rehabilitation

This project includes the rehabilitation and remodel of Fire Station 4.

Project Manager: Mahsima Mohammadi, (760) 435-3548 or MMohammadi@oceansideca.org

Project#: CIP18-00002

Program: Municipal Buildings

Duration: 02/27/2018 - 03/24/2020

     

Barrier at College/N River Road

This project includes the construction of new median and pedestrian barriers at the intersection of College and North River Road.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@Oceansideca.org

Project#: CIP18-00001

Program: N/A

Duration: 02/13/2018 - 06/04/2020

     

RDO Drainage Upgrades - Casa De Amparo

Drainage improvements for Casa De Amparo and Ivey Ranch.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@Oceansideca.org

Project#: CIP18-00006

Program: Drainage

Duration: 05/31/2018 - 06/04/2020

         


EOC Emergency Room - Guajome Room

Installation of emergency backup power to City of Oceanside Guajome Conference Room.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@Oceansideca.org

Project#: CIP18-00014

Program: Municipal Buildings

Duration: 10/30/2018 - 06/04/2020


Emergency Power OPD/Mission Library

Installation of emergency backup power to OPD and Mission Library.

Project Manager: Victor Velasco, (760) 435-5102 or VVelasco@Oceansideca.org

Project#: CIP18-00019

Program: Municipal Buildings

Duration: 10/30/2018 - 06/04/2020

         


RO Plant Fiber Optic

Installation of fiber optic conduit for reverse osmosis plant to improve communication capabilities.

Project Manager: Victor Velasco, (760) 435-5102

Project#: CIP18-00023

Program: Miscellaneous City Capital

Duration: 11/28/2018 - 06/04/2020

                   


Harbor Tunnel Improvements

This project includes ADA improvements at the harbor tunnel pedestrian crosswalk.

Project Manager: Victor Velasco, (760) 435-5102

Project#: CIP19-00005

Program: Harbor

Duration: 03/15/2019 - 11/23/2020